top of page

Flooded with Development but not Prepared

Originally published in the Westmore News in November 2021


Port Chester is a village, but we are attracting an incredibly high level of development interest. In addition to what is already being built, this is what is currently in the works:


1 15-story building

4 12-story buildings

5 6-story buildings


Will Port Chester benefit from having all these buildings? Can we really absorb this number of cars, people, students, fire and police calls, trash, and sewage?


The Form-Based Code has re-zoned the village to an astonishing degree, but we don’t seem to have taken the steps to prepare for all this development. We don’t have a comprehensive traffic plan, let alone a comprehensive flood mitigation plan. Wouldn’t it make sense to put those together first?


There was a Flash Flood Watch in our area as I wrote this letter last Tuesday. Isn’t everyone worried about the homes and businesses of their friends and neighbors?


Peter Cole

Port Chester

Recent Posts

See All

Comments


Commenting has been turned off.
bottom of page